So the past few days have been spent moving from my old "Dry" CHU (i.e. no water connections) to a brand new, only sat around for two years waiting to be installed, "Wet" CHU. The new one has a sink in my room and shares a toilet and shower with one other person. Additionally, the room got bigger in the process.
The downside of course is that we had to build all of our new furniture because it came disassembled. So here are some pictures of the new room, the assembly process, and how it looks now.
First, the empty room:
The bathroom:
An assembled Bed:
And the "instructions":
The completed wardeobe:
I will post pictures of the room with all my stuff once I am settled.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment